Laying out the trail
Connecting into the existing trail. We repaired the erosion and added drainage features to the existing trail.
We rerouted the trail to the left of this steep eroded section.
If you look carefully you can see the flagging and the tracks from the excavator. This is where the trail will be.
The new trail will run through here and up to Barham Ridge.
Repairing some of the old rutted trail.